For this project, we demolished a 1950’s detached house in order to build this large 400 Sqm 5-bedroom new build house.
Along with a high-end specification throughout. This project included a full heat recovery system, Solar panels with a battery backup and a rainwater harvesting system.
All the joinery and staircase were constructed by our in-house joinery team.
Architects: Mathew Giles Architects